Saturday, 9 January 2010

shed continued..

before xmas

..no door :-(

after xmas:
now with door! :-) ..and snow.before xmas:
levelling compound on floor and the 'red bed' becomes the red wall!





after xmas:
floor, wall and ceiling insulated with 70mm polystyrene blocks and boarded with 8mm ply and tongue+groove chipboard on floor (filler necessary for poor cutting).



before xmas:
more red bed in its new life as red wall.



after xmas:
another shot of the new door, boards and flooring.
The ship window looks very nice in its new home too!




Tomorrow..PAINTING! ..whilst grumps sorts out the electricity..