..no door :-(
after xmas: now with door! :-) ..and snow.
before xmas: levelling compound on floor and the 'red bed' becomes the red wall!

after xmas:
floor, wall and ceiling insulated with 70mm polystyrene blocks and boarded with 8mm ply and tongue+groove chipboard on floor (filler necessary for poor cutting).

before xmas:
more red bed in its new life as red wall.

after xmas:
another shot of the new door, boards and flooring.
The ship window looks very nice in its new home too!

Tomorrow..PAINTING! ..whilst grumps sorts out the electricity..
No comments:
Post a Comment